RFQ Readiness Checklist

A work roll RFQ moves fastest when this information is ready up front. Check off what you already have — the rest, we confirm together on the call.

0 / 6 ready
Roll drawing or dimensions — barrel diameter, barrel length, chock configuration
Mill stand position — roughing, finishing, or cold
Governing standard — ASTM, JIS, or your program’s own spec
Testing scope — full UT/MT bond and surface scan vs. sample-based QC
Surface finish requirement — especially for cold mill strip-flatness duty
Third-party witness inspection — needed for your program, or not