Oilfield Tools Manufacturing and Supply, Matched to Your Drawing

Oilfield equipment through a drawing-led engineering and supply route

Welong brings oilfield equipment—including downhole tools, well-control equipment, cementing equipment, drill bits, handling tools, hoses and tongs—into a drawing-led engineering and supply route. The route is built for oil and gas operators, drilling contractors and service companies that need the manufacturing route and inspection package defined before an order is released.

24 hours

An enquiry is answered within 24 hours

1–3 days

Drawing-based quotation when the input is complete

IGES / DWG

Accepted for drawing review

Order-linked

Material, dimensional and order-specific NDT records as quoted

Material, Service-Condition and Final-Condition Review

Material decisions start with the duty, not a generic grade list. The enquiry should state the product family, requested grade, connection, temperature, pressure or load, and any sour-service or corrosion requirement. Those inputs are compared with the drawing, and the agreed material basis is placed in the quotation.

Drilling Stabilizer product image
Surface protection and final-condition review

Inputs and quotation output by product group

Product groupInputs to state in the RFQQuotation output

Downhole and drill string

Grade, connection, hole size, load, temperature and fluid exposureModel or drawing route, material basis and inspection scope

Wellhead and well control

Pressure rating, bore, temperature class, fluid and material classProduct-level configuration and governing specification

Handling and tong equipment

Tubular OD, load, torque, interface and operating methodMatched model and acceptance checks

Hoses

Service, working pressure, temperature, ID, length and end connectionsHose family, end configuration and test-document plan

Mill rolls and forgings

Material, heat treatment, dimensions, hardness target and machining allowanceManufacturing route and inspection hold points

Surface Protection and Final-Condition Controls

Surface treatment is quoted against the product, transport route and service condition. State the required coating or protection system, colour, thickness or roughness target, protected interfaces and packing restrictions. The quotation then records what is included, who performs it and which inspection record is supplied.

Keep sealing faces, threads and gauging surfaces separate from general coating instructions.

State whether hardness, roughness, coating thickness or visual acceptance requires a report.

Identify preservation and packing requirements for sea, air or long-term storage.

Place buyer witness points in the inspection plan before production starts.

The agreed material basis and final condition are recorded in the quotation.

Send material and service requirements with the drawing.

Send Requirements

Product Centres for Oilfield and Industrial Procurement

Browse the product centres below, then send the model, drawing or service envelope for a product-level check.
Drilling Stabilizer product image

Downhole Drilling Tools

Model or drawing routeHole, load and connection
  • stabilizers, drill-string components, drilling jars, mud motors, roller reamers and related tools.
  • Send the model, drawing or service envelope for a product-level check.
Casing Head and Tubing Head product image

Wellhead & Well Control

Pressure-control routeBore, pressure and class
  • casing and tubing heads, blowout preventers and pressure-control assemblies.
  • Send the model, drawing or service envelope for a product-level check.
Overshot and Junk Basket product image

Fishing & Milling Tools

Recovery objectiveFish, hole and connection
  • overshots, fishing jars, scrapers, junk mills and taper mills.
  • Send the model, drawing or service envelope for a product-level check.
Tricone Drill Bit product image

Drill Bits (Tricone & PDC)

Tricone or PDCFormation and hole size
  • tricone and PDC options routed by formation, hole size and operating plan.
  • Send the model, drawing or service envelope for a product-level check.
Casing Centralizer product image

Cementing Tools

Casing programmeSize and plug arrangement
  • centralizers, float equipment and cement heads.
  • Send the model, drawing or service envelope for a product-level check.
Bucking Unit product image

Oilfield Tongs & Bucking Units

Tubular handlingOD, load and torque
  • manual and powered tubular-handling systems.
  • Send the model, drawing or service envelope for a product-level check.
Lifting Bail product image

Pipe Handling Tools

Model matchingTubular OD and load
  • elevators, links, slips and clamps.
  • Send the model, drawing or service envelope for a product-level check.
Drilling Hose product image

Oilfield Hoses

Service and pressureID, length and ends
  • drilling, control, choke and kill hose families.
  • Send the model, drawing or service envelope for a product-level check.
Work Roll product image

Mill Rolls

Industrial product centreGrade and mill duty
  • work rolls and other roll families matched by grade, heat treatment and mill duty.
  • Send the model, drawing or service envelope for a product-level check.
Forged Shafts product image

Industrial Forgings

Drawing-based routeMaterial and heat treatment
  • shafts and drawing-based forged components.
  • Send the model, drawing or service envelope for a product-level check.

How the manufacturing route is identified

Welong routes product enquiries through the Jiyuan manufacturer or another responsible producer named in the quotation. The Xi’an address is the company headquarters, and the order documents identify the manufacturing route and inspection records.

Not sure which model fits the service envelope?

Check the Specification Envelope
Product-level routingFinal drawing and service condition govern

Representative Product-Level Specification Envelopes

These rows are starting points for model selection, not a company-wide capability claim. The final drawing, connection, service condition and applicable standard govern the order.

Product familyVerified catalogue envelopeRFQ decision
Drilling jars3-1/8–9-1/2 in OD; 79,000–670,000 lb maximum working loadSelect model, connection and jarring requirements
Drilling mud motors1-7/8–7-7/8 in hole size; 0.5–16 L/s flowConfirm hole size, flow, torque and connection by model
Roller reamers6–42 in hole sizeConfirm placement, connection and formation conditions
Annular and ram BOP models2,000–15,000 psi working pressureConfirm bore, pressure, temperature and material class
Cement heads5-1/2–13-3/8 in casing; 35 or 50 MPa working pressureMatch casing size, connection and plug arrangement
Junk mills80–425 mm OD across 14 listed sizesConfirm fish, hole ID, connection and dressing
Pipe elevators1.05–36 in size range; 27 kN–500 t listed working-load rangeMatch tubular OD, profile and model-specific rated load
Casing scrapers4-1/2–13-3/8 in casing rangeConfirm casing ID, connection and cleaning objective

Use the envelope to route the enquiry

The model, connection, material and inspection scope are fixed in the quotation.

Check the specification envelope

Next step

  1. Send the product family and model if known
  2. Add the drawing and service condition
  3. Confirm quantity and required date

Inspection, Documentation and Release Evidence

Inspection planning is agreed before production. Each quotation identifies the material certificate, dimensional report and order-specific NDT reports included with the shipment, together with any buyer or third-party witness point.

Control pointWhat is checkedOrder evidenceBoundary
Material identityHeat or batch reference matched to the orderMaterial certificate named in the quotationDocument type follows the agreed order
DimensionsDrawing dimensions and product-specific acceptance pointsDimensional reportFinal drawing and revision govern
Non-destructive examinationMethod and acceptance points in the inspection planOrder-specific NDT reports where requiredIncluded only where the product and plan call for it
Witness pointsBuyer or third-party hold and witness pointsInspection records identified in the quotationAgreed before production
Release and shipmentReleased item identity and document identityShipment dossier tied to the same itemNo blanket company-wide evidence claim

What the standards references mean

Standards named on this page define product or document requirements; they do not establish a separate company authorization claim.

Product specifications and editions are confirmed in the quotation.

Buyer-approved drawings, the responsible producer’s model tables, Welong quotations and agreed inspection plans are the order-specific references for the product supplied.

References and source owners

Define the inspection package in your RFQ

Send the drawing and acceptance requirements →

Quotation, Price Drivers and Delivery Commitment

Price is set by material, geometry, quantity, manufacturing route, inspection scope, documentation and destination. We do not publish one price or one production lead time across unrelated product families.

Oilfield project quotation review

What the quotation fixes

  • The first response arrives within 24 hours and flags missing technical inputs.
  • A drawing-based quotation follows in 1–3 working days when the input is complete.
  • Each quotation names the manufacturing route, included inspection records and commercial terms.
  • A committed delivery date is tied to the quoted quantity and inspection plan.
Manufacturing route and inspection planning

Order Control from Drawing Review to Shipment

The same order identity follows the technical route, inspection and released shipment.

StageControlOutput
1. Scope reviewProduct family, drawing, service condition and missing inputsComplete enquiry basis
2. Technical routeExisting model or drawing-based manufacturing routeNamed technical route
3. Quotation controlMaterial, route, inspection, documents and deliveryControlled quotation
4. Production routeResponsible producer and manufacturing route named in the quotationOrder-linked production
5. Inspection and releaseAgreed drawing and inspection planRelease evidence
6. Shipment dossierReleased items and documents under the same identityAuditable shipment file

Delivery commitment follows the quoted scope

A committed delivery date is tied to the quoted quantity and inspection plan.

Send a complete RFQ

Include the product or drawing, quantity, dimensions, connection, material, pressure or load, service environment, inspection requirements, destination and required date.

Request a drawing-based quotation

Price drivers recorded at quotation

Material and geometry

Grade, heat treatment, size, connection and drawing complexity

Quantity and route

Batch quantity and responsible manufacturing route

Inspection and documents

Tests, witness points and shipment dossier

Destination and required date

Commercial terms and the committed schedule

Find the likely product-standard family

Traceability a Buyer Can Audit

Welong uses order records rather than unsupported counters as homepage proof. Parts released with the agreed document package carry a serial number linked to the order record.

Connect the item to its release evidence

The quotation names the responsible producer and manufacturing route, so a buyer can connect the ordered item to its inspection and release records.

The final drawing, inspection plan and quoted document package govern the order.

Order Records and Product Evidence

Order identity

Product, drawing revision and order reference

Material record

Certificate named in the quotation

Dimensional report

Acceptance against the agreed drawing

Welong API 7-1 and API 7-2 Certificates

Order-specific NDT

Reports supplied where the plan requires them

Responsible producer

Named with the manufacturing route

Shipment dossier

Tied to the same released item identity

Ask the quotation to name each link before production begins.

FIELD
WHAT IT NAMES
WHY IT MATTERS
Product and order
Item, drawing revision and order identity
Connects the requirement to the released item
Responsible producer
Producer and manufacturing route named in the quotation
Separates headquarters from the production route
Material
Certificate and heat or batch reference
Ties material identity to the order
Dimensions
Report against the agreed drawing
Records product-specific acceptance points
NDT
Order-specific reports where required
Keeps the evidence within the agreed inspection plan
Release and shipment
Released item and shipment dossier identity
Keeps the physical item and documents together

Scope Boundaries Before You Send an RFQ

This homepage covers manufacture and supply against a model, drawing or defined service envelope. Welong does not quote rework of used equipment on this site. It also does not apply one company-wide pressure, size, material or lead-time number across unrelated product centres.

If the requirement sits outside a published product envelope, send the drawing and service conditions. We will either identify a route in the quotation or decline the scope before the order is placed.

Route named in the quotation

The quotation identifies the responsible producer, manufacturing route and inspection scope.

No blanket certification claim

A cited product specification is not presented as a separate company authorization.

×Enlarged View

Procurement Questions

Use these answers to prepare the first enquiry. Product-level specifications, manufacturing route, inspection records and the committed date are fixed in the quotation.

How quickly will Welong respond to an enquiry?

The first response arrives within 24 hours. When the technical and commercial input is complete, a drawing-based quotation follows in 1–3 working days; otherwise, the response identifies what is still needed.

Which files can I send?

IGES and DWG files are accepted.

Where should I start if I do not know the exact model?

Start with the relevant product centre and send the operating envelope. Hole or tubular size, connection, pressure or load, fluid, temperature and required date usually narrow the route. If a catalogue model does not fit, attach the drawing so the quotation can state a drawing-based route or decline the scope before order.

Does Welong manufacture every item on this website?

No single route applies to every product. Each quotation names the responsible producer and manufacturing route, together with the applicable inspection and release requirements.

Does a cited API or ISO specification mean Welong is certified?

No. A specification defines product or test requirements. A company authorization is a separate claim and is not made on this homepage without current, entity-matched evidence.

What documents can be included with the shipment?

The quotation lists the material certificate, dimensional report and order-specific NDT reports included. The exact package follows the product and inspection plan.

How is production lead time set?

The quotation sets the committed date.

Can Welong review my material or coating requirement?

Yes. State the requested material, service environment, heat treatment, surface condition and acceptance requirement. We record the agreed basis in the quotation.

How do I know who is responsible for the manufacturing route?

The quotation names the responsible producer and manufacturing route. Inspection and release requirements are attached to that route.

What should I include in the first RFQ?

Send the product or drawing, quantity, dimensions, connection, material, pressure or load, service environment, inspection requirements, destination and required date.

Send the Drawing and Define the Route Before Order

Attach the drawing or specification sheet and include quantity, service condition, inspection requirements, destination and required date. We will identify missing inputs in the first response and return the manufacturing route, document package and delivery commitment in the quotation.

Email oiltools@welongpost.com, call +86 029 88331331, or message WhatsApp +86 135 7217 2362.